Effective September 17, 2024
RATE SCHEDULE RS (RESIDENTIAL SERVICE)
Rate per month | |
Customer Facilities Charge per month | $ 2.85 |
Energy Charge cents per KWH | $0.08837 |
Fuel Charge per KWH | $0.02293 |
RATE SCHEDULE GS (GENERAL SERVICE)
Rate per month | |
Customer Facilities Charge per month | $ 2.85 |
Energy Charge cents per KWH | $0.14510 |
Fuel Charge per KWH | $0.02293 |
RATE SCHEDULE GSD (GENERAL SERVICE DEMAND)
Rate per month | |
Customer Facilities Charge per month | $20.00 |
Demand Charge Dollars per KW Demand | $8.744 |
Energy Charge cents per KWH | $0.04998 |
Fuel Charge per KWH | $0.02293 |
Effective September 17, 2024
SC-1: METERED DOMESTIC WATER
per month-per 1,000 Gallons | $5.57 |
(unreturned domestic water may be excluded pursuant to Section 3.03 (b) (3) of the Potable Water Service Rules and Regulations)
All unmetered areas as follows:
SC-2: CONSTRUCTION TRAILERS
per month, per unit | $43.43 |
SC-3: THEATERS
per month, per seat | $0.894 |
SR-1: MONTHLY RATE FOR RESIDENTIAL SEWER SERVICE
Each active residential account shall be billed on the basis of a two-part rate consisting of a customer charge and a volumetric charge based on metered water usage during the billing period.
Monthly Customer Charge | $3.09 |
Volumetric Charge for Metered Water Usage per 1,000 Gallons | $4.23 |
The minimum monthly charge shall be the customer charge.
The maximum monthly sewer service charges for residential customers, receiving potable water service through a 5/8 x 3/4 inch or 1 inch meter shall not exceed an amount computed on the basis of 8,000 gallons of metered water usage plus the monthly customer charge.
Effective September 17, 2024
RATE SCHEDULE GS-1 (GENERAL SERVICE)
Consumption Rate-Based upon water used per meter, per month, and shall be in addition to the monthly readiness-to-serve rate.
Consumption Charge | |
Cents per 1,000 Gallons | $0.5010 |
Readiness To Serve Rate Based upon meter size, per month, and shall be in addition to the monthly consumption charge.
METER SIZE | |
5/8″ | $12.06 |
3/4″ | $12.06 |
1" | $30.22 |
1.5" | $60.57 |
2" | $96.80 |
3" | $193.54 |
4" | $302.43 |
6" | $604.74 |
8" | $967.66 |
10" | $1,391.02 |
RATE SCHEDULE GS-2 (UNMETERED TO TRAILERS)
Rate per month, per unit | $6.89 |
*New rate for reclaimed water use in unmetered trailers.
Effective SEPTEMBER 17, 2024
RATE SCHEDULES FOR FRONT END LOADERS
BASE CHARGE PER PICKUP |
TONNAGE RATE |
|
---|---|---|
FE-1: 10 cu yd compactor | $114.61 | N/A |
FE-2: 5 cu yd compactor | $129.53 | N/A |
FE-3: 8 cu yd box | $68.27 | N/A |
FE-4: 6 cu yd box | $60.55 | N/A |
RATE SCHEDULES FOR ROLL-OFF CLASS I (1)
BASE CHARGE PER PICKUP |
TONNAGE RATE |
|
---|---|---|
RO1: 40 cu yd compactor | $558.43 | $174.20 |
RO2: 30 cu yd compactor | $558.43 | $174.20 |
RO10: 20 cu yd box (class I) | $558.43 | $174.20 |
RO11: 30 cu yd box (class I) | $558.43 | $174.20 |
RATE SCHEDULES FOR ROLL-OFF CLASS III (2)
BASE CHARGE PER PICKUP |
TONNAGE RATE |
|
---|---|---|
RO-6: 30 cu yd box (landscape) | $716.85 | N/A |
RO-7: 20 cu yd box (landscape) | $716.85 | N/A |
RO-8: 20 cu yd box (construction) | $702.86 | N/A |
RO-12: 20 cu yd box (class III) | $716.85 | N/A |
RO-20:20 cu yd box | $612.34 | N/A |
RATE SCHEDULES FOR TIRE DISPOSAL
BASE CHARGE PER PICKUP |
TONNAGE RATE |
|
---|---|---|
RO-9: 20 cu yd box (tire disposal) | $2117.55 | N/A |
RATE SCHEDULES FOR MINI PACKERS
BASE CHARGE PER PICKUP |
TONNAGE RATE |
|
---|---|---|
MP-2: 15 cu yd truck | $36.79 | $175.56 |
SURCHARGE RATES
BASE CHARGE PER PICKUP |
|
---|---|
SC-2:Rejected recyclable container surcharge (8 cu yd box) | $68.27 |
SC-3:Rejected recyclable container surcharge (20 cu yd box) | $612.34 |
(1) Class I material constitutes sanitary landfill wastes (household and kitchen waste and refuse) excluding hazardous and regulated wastes.
(2) Class III material constitutes generated construction debris and yard waste excluding hazardous, regulated and sanitary landfill wastes.
Effective SEPTEMBER 17, 2024
RATE SCHEDULE HTHW
Consumption Charge per month per MMBTU | $53.79 |
Effective September 17, 2024
RATE SCHEDULE LTHW
Consumption Charge per month per MMBTU | $45.30 |
Effective September 17, 2024
RATE SCHEDULE CW-1
Consumption Charge per month (CEP) per Ton hour | $.2208 |
RATE SCHEDULE CW-2
Consumption Charge per month (EEP) per Ton hour | $.2285 |
RATE SCHEDULE CW-3
Consumption Charge per month (SEP) per Ton hour | $.2459 |
Effective September 17, 2024
Consumption Rate-Based on water used per meter, per month, and shall be in addition to the monthly readiness-to-serve charge.
RATE SCHEDULE GS-1 (GENERAL SERVICE)
Consumption Charge Cents per 1,000 Gallons |
$.8969 |
METER SIZE | |
5/8" | $20.66 |
3/4" | $20.66 |
1" | $51.68 |
1.5" | $103.38 |
2" | $165.48 |
3" | $330.98 |
4" | $517.25 |
6" | $1,034.47 |
8" | $1,655.13 |
10" | $2,379.16 |
RATE SCHEDULE GS-2
Consumption Rate-Based on water metered at all wells in Sub-district 1
Consumption Charge: per 1,000 Gallons |
$1.2005 |
RATE SCHEDULE GS-3 (UNMETERED TO TRAILERS)
Rate per month, per unit |
$9.52 |
Effective September 17, 2024
RATE SCHEDULE RS (RESIDENTIAL SERVICE)
Non Fuel Energy Charge per Therm | $.2676 |
Cost of Purchased Gas per Therm | $.4623 |
Minimum Bill per Month | $5.00 |
RATE SCHEDULE GS (GENERAL SERVICE)
Non Fuel Energy Charge per Therm | $.2676 |
Cost of Purchased Gas per Therm | $.4623 |
Minimum Bill per Month | $5.00 |
A connection charge of $500.00 shall apply to all applications for service for Electric, Potable Water, Reclaimed Water, Natural Gas and Conditioned Water services provided by the District