Effective September 17, 2024

RATE SCHEDULE RS (RESIDENTIAL SERVICE)

Rate per month
Customer Facilities Charge per month$ 2.85
Energy Charge cents per KWH$0.08837
Fuel Charge per KWH$0.02293

RATE SCHEDULE GS (GENERAL SERVICE)

Rate per month
Customer Facilities Charge per month$ 2.85
Energy Charge cents per KWH$0.14510
Fuel Charge per KWH$0.02293

RATE SCHEDULE GSD (GENERAL SERVICE DEMAND)

Rate per month
Customer Facilities Charge per month$20.00
Demand Charge Dollars per KW Demand$8.744
Energy Charge cents per KWH$0.04998
Fuel Charge per KWH$0.02293

Effective September 17, 2024

SC-1: METERED DOMESTIC WATER

per month-per 1,000 Gallons$5.57

(unreturned domestic water may be excluded pursuant to Section 3.03 (b) (3) of the Potable Water Service Rules and Regulations)

All unmetered areas as follows:

SC-2: CONSTRUCTION TRAILERS

per month, per unit$43.43

SC-3: THEATERS

per month, per seat$0.894

SR-1: MONTHLY RATE FOR RESIDENTIAL SEWER SERVICE

Each active residential account shall be billed on the basis of a two-part rate consisting of a customer charge and a volumetric charge based on metered water usage during the billing period.

Monthly Customer Charge$3.09
Volumetric Charge for Metered Water Usage per 1,000 Gallons$4.23

The minimum monthly charge shall be the customer charge.

The maximum monthly sewer service charges for residential customers, receiving potable water service through a 5/8 x 3/4 inch or 1 inch meter shall not exceed an amount computed on the basis of 8,000 gallons of metered water usage plus the monthly customer charge.

Effective September 17, 2024

RATE SCHEDULE GS-1 (GENERAL SERVICE)

Consumption Rate-Based upon water used per meter, per month, and shall be in addition to the monthly readiness-to-serve rate.

Consumption Charge 
Cents per 1,000 Gallons$0.5010

Readiness To Serve Rate Based upon meter size, per month, and shall be in addition to the monthly consumption charge.

METER SIZE 
5/8″$12.06
3/4″$12.06
1"$30.22
1.5"$60.57
2"$96.80
3"$193.54
4"$302.43
6"$604.74
8"$967.66
10"$1,391.02

RATE SCHEDULE GS-2 (UNMETERED TO TRAILERS)

Rate per month, per unit$6.89

*New rate for reclaimed water use in unmetered trailers.

Effective SEPTEMBER 17, 2024

RATE SCHEDULES FOR FRONT END LOADERS

 BASE CHARGE
PER PICKUP
TONNAGE
RATE
FE-1: 10 cu yd compactor$114.61N/A
FE-2: 5 cu yd compactor$129.53N/A
FE-3: 8 cu yd box$68.27N/A
FE-4: 6 cu yd box$60.55N/A

RATE SCHEDULES FOR ROLL-OFF CLASS I (1)

 BASE CHARGE
PER PICKUP
TONNAGE
RATE
RO1: 40 cu yd compactor$558.43$174.20
RO2: 30 cu yd compactor$558.43$174.20
RO10: 20 cu yd box (class I)$558.43$174.20
RO11: 30 cu yd box (class I)$558.43$174.20

RATE SCHEDULES FOR ROLL-OFF CLASS III (2)

 BASE CHARGE
PER PICKUP
TONNAGE
RATE
RO-6: 30 cu yd box (landscape)$716.85N/A
RO-7: 20 cu yd box (landscape)$716.85N/A
RO-8: 20 cu yd box (construction)$702.86N/A
RO-12: 20 cu yd box (class III)$716.85N/A
RO-20:20 cu yd box$612.34N/A

RATE SCHEDULES FOR TIRE DISPOSAL

 BASE CHARGE
PER PICKUP
TONNAGE
RATE
RO-9: 20 cu yd box (tire disposal)$2117.55N/A

RATE SCHEDULES FOR MINI PACKERS

 BASE CHARGE
PER PICKUP
TONNAGE
RATE
MP-2: 15 cu yd truck$36.79$175.56

SURCHARGE RATES

 BASE CHARGE
PER PICKUP
SC-2:Rejected recyclable container surcharge (8 cu yd box)$68.27
SC-3:Rejected recyclable container surcharge (20 cu yd box)$612.34

(1) Class I material constitutes sanitary landfill wastes (household and kitchen waste and refuse) excluding hazardous and regulated wastes.
(2) Class III material constitutes generated construction debris and yard waste excluding hazardous, regulated and sanitary landfill wastes.

Effective SEPTEMBER 17, 2024

RATE SCHEDULE HTHW

Consumption Charge per month per MMBTU$53.79

Effective September 17, 2024

RATE SCHEDULE LTHW

Consumption Charge per month per MMBTU$45.30

Effective September 17, 2024

RATE SCHEDULE CW-1

Consumption Charge per month (CEP) per Ton hour$.2208

RATE SCHEDULE CW-2

Consumption Charge per month (EEP) per Ton hour$.2285

RATE SCHEDULE CW-3

Consumption Charge per month (SEP) per Ton hour$.2459

Effective September 17, 2024
Consumption Rate-Based on water used per meter, per month, and shall be in addition to the monthly readiness-to-serve charge.

RATE SCHEDULE GS-1 (GENERAL SERVICE)

Consumption Charge
Cents per 1,000 Gallons
$.8969
METER SIZE 
5/8"$20.66
3/4"$20.66
1"$51.68
1.5"$103.38
2"$165.48
3"$330.98
4"$517.25
6"$1,034.47
8"$1,655.13
10"$2,379.16

RATE SCHEDULE GS-2

Consumption Rate-Based on water metered at all wells in Sub-district 1

Consumption Charge:
per 1,000 Gallons
$1.2005

RATE SCHEDULE GS-3 (UNMETERED TO TRAILERS)

Rate per month,
per unit
$9.52

Effective September 17, 2024

RATE SCHEDULE RS (RESIDENTIAL SERVICE)

Non Fuel Energy Charge per Therm$.2676
Cost of Purchased Gas per Therm$.4623
Minimum Bill per Month$5.00

RATE SCHEDULE GS (GENERAL SERVICE)

Non Fuel Energy Charge per Therm$.2676
Cost of Purchased Gas per Therm$.4623
Minimum Bill per Month$5.00

A connection charge of $500.00 shall apply to all applications for service for Electric, Potable Water, Reclaimed Water, Natural Gas and Conditioned Water services provided by the District